Highlights include:
- Remove existing TPO, underlying iso-board, and flute fill
- Leave existing metal roof
- Install an average of 1.5" of spray foam
- Install 15 mils of basecoat of coating
- Install 10 mils of topcoat of coating
- Embed granules into topcoat
- Install 10-mil-thickness of silicone around vertical metal wall panels on all sides of building
- Final walkthrough and issuance of 15-year Full System, NPR, NDL, Renewable warranty.
Vertical walls received a 5 year warranty.