Roofing Projects in Akron, OH
Take a look at some of our best projects below

Ironrock - Building #1 - Canton, Ohio
- Spray foam roofing over existing TPO
- 31,200 square feet
- 15-year, renewable, NDL, NPR warranty granted
- Average 1.5" thickness of 3lb. spray foam
- Basecoat of 15 mil thickness of high-solids silicone coating
- Topcoat of 10 mil thickness of high-solids silicone coating
- Granules embedded into topcoat
- New custom-fabricated (in-house) metal perimeter detail around edges
- All perimeter metal walls prepped and coated with HS silicone
- Completed July 2025

Coventry Schools - Modular Classroom Unit - Akron, OH
- Spray foam roofing over existing EPDM
- 10,946 square feet
- 20-year, renewable, NDL, NPR warranty granted
- 1/2" high-density coverboard installed over EPDM
- All 22 existing drains removed. Replaced with new gutter system, improving drainage
- New 24-guage, Kynar finished, custom-fabricated foam stop installed along perimeter edge
- Average 1.5" thickness of 3lb. spray foam
- Basecoat of 20 mil thickness of high-solids silicone coating
- Topcoat of 10 mil thickness of high-solids silicone coating
- Granules embedded into topcoat
- Completed August 2025

Peoples Services - Marvo - Bldg 8 Northern Lower Area - Akron, OH
- Spray foam roofing over existing Metal
- 123,000 square feet
- Flush panel and skylights covered with OSB
- 25-year, renewable, NDL, NPR warranty granted
- Average 2" thickness of 3lb. spray foam
- Basecoat of 15 mil thickness of high-solids silicone coating
- Topcoat of 15 mil thickness of high-solids silicone coating
- Granules embedded into topcoat
- New custom-fabricated (in-house) metal perimeter detail around edges
- Completed May 2025

GAR Foundation - Akron, Ohio
- Silicone roof coating system over existing EPDM
- 2,748 square feet
- 20-year, renewable, NDL, NPR warranty granted
- Install single-ply primer
- Install acrylic bleed blocker
- Raised NE section of roof to receive new 24-gauge, Kynar finished counterflashing
- Basecoat of 15 mil thickness of high-solids silicone coating
- Topcoat of 15 mil thickness of high-solids silicone coating
- Project completed May 2024

Coventry Local Schools-Elem & Middle School - Akron, OH
- Spray foam roofing over existing EPDM
- 61,187 square feet
- 20-year, renewable, NDL, NPR warranty granted
- 1/2" high-density coverboard installed
- Average 1.5" thickness of 3lb. spray foam
- Basecoat of 20 mil thickness of high-solids silicone coating
- Topcoat of 10 mil thickness of high-solids silicone coating
- Granules embedded into topcoat
- New custom-fabricated (in-house) metal perimeter detail around edges
- Project completed July 2023

People's Services - Marvo - Building 8 - Northern Low Area
- Project Type: Spray foam roofing installed over an existing metal roof
- Building Type: Distribution Center
- City: Akron, Ohio
- Size: 123,000 square feet
- Time to Complete: 37 days
- Year Completed: 2024

Bernard Mechanical-Section 1-6
- Project Type: Spray foam roofing installed over an existing EPDM roof
- Building Type: Heating and Cooling Contractor
- City: Akron, Ohio
- Size: 10,850 square feet
- Time to Complete: 3 days
- Year Completed: 2023